Merger Basics - INTERNAL

Data Migration Basics for a Merger Project

A merger data migration is more than moving records from one core banking system into another.  The data must be mapped correctly, converted consistently, and validated against the institution’s business requirements before go-live.

This article introduces the basic merger cycle used at Lodestar and the database schemas involved. Use it as a starting point alongside your project-specific mapping documents, conversion procedures, and cutover plan.

The Merger Migration Cycle

The core cycle is Mapping → Cuts → Validation → Repeat multiple times until Go-Live . Each iteration helps the project team identify issues, refine conversion rules, and prepare for the final migration.

1. Mapping: Define where the data belongs

Mapping connects source-system data to its intended destination in the receiving core banking system (often DNA) . It also documents how values should be translated, formatted, or handled when information is missing.

For each mapping, confirm:

  • Source: Where does the data come from, and what does it mean?
  • Destination: Where should it appear in the receiving core banking system?
  • Conversion rules: Does the value need to be translated, reformatted, or combined with other data?
  • Required information: What must be populated for the destination record to be created?
  • Exceptions:  How will missing, invalid, or unmapped values be resolved?

For example, a validation rule may require a person’s date of birth before a new Person record can be created. Confirm the applicable rules for your project rather than assuming every record follows the same requirements.

Our merger clients' team provides the business meaning of the data. We work together to confirm that the mapping reflects the intended outcome in DNA.

2. Cuts: Run the conversion

A cut is a conversion run using a defined set of source data and the mapping rules available at that point in the project. Test cuts give the team an opportunity to review results before the final go-live conversion.

Before each cut, confirm the source extract, target environment, mapping version, and approved run procedures. Record any known limitations so reviewers understand what to expect.

During the conversion, source data is loaded into the staging area and processed using the project’s conversion objects and rules. Capture logs and exceptions so issues can be traced to the relevant records and processing steps.

Important: Run conversions only in the approved environment and follow the project-specific procedures for loading, resetting, or rerunning data.

3. Validation: Confirm the results

A completed conversion run does not, by itself, confirm that the data is correct.  Validation checks both the technical results and whether the converted information supports day-to-day operations.

Use a validation checklist appropriate to the project’s scope:

  • Completeness: Compare source and converted record counts, and explain exclusions or rejected records.

     

  • Financial reconciliation: Where applicable, compare balances and control totals using the same effective date and scope.

     

  • Field accuracy: Review key values, including names, dates, identifiers, statuses, and mapped codes.

     

  • Relationships: Confirm that people, organizations, accounts, and related records are linked correctly.

     

  • Business usability: Review representative records in the receiving core banking screens or functions.

     

  • Exceptions: Investigate missing required values, rejected records, and unexpected results.

     

  • Access: Confirm that the appropriate users can access what they need for testing and operational review.

Document each issue with the affected record reference, expected result, actual result, and enough detail to reproduce it.  Handle sensitive information through approved project channels.

4. Repeat: refine and retest

“Rinse and repeat” means using each cut’s findings to improve the next one.

  1. Review validation results with the business and technical teams.

  2. Identify whether each issue comes from source data, mapping, conversion logic, or configuration.

  3. Agree on the correction and assign an owner.

  4. Update the relevant data, mapping, or conversion objects.

  5. Run the next approved cut and retest affected areas.

  6. Recheck previously validated areas when changes could affect them.

Keep a record of mapping decisions, fixes, and validation results. This gives the team a shared basis for assessing readiness.

Key Merger Terms for Lodestar Users

  • DNA:  Often, the destination core banking system referenced in this merger process.

  • OSI: Open Solutions Inc., a name that appears in the database schema naming conventions for DNA banking conversions.

  • Schema: A collection of database objects owned by a database user. In this environment, schema names identify where particular tables, procedures, packages, and other objects reside.

  • Go-live:  The point when the institution begins using the converted production data for operations.

  • -Cutover: The coordinated activities used to move from the existing system to the live destination environment.

Database schemas to know

The following schemas have distinct roles in the DNA merger environment. Confirm environment-specific details with the technical team before making changes.

Schema Name Details
OSIBANK

DNA production schema and the final destination for converted data. 

Treat changes as production-impacting when working in the live environment. Follow approved conversion and change procedures. 

DMPDATA

Staging area for data that will be converted into DNA.

It also holds conversion-related objects, such as procedures, packages, temporary tables, and logging tables.

Prepare the required objects before conversion runs. This area is expected to remain static after go-live and should be scheduled for cleanup shortly afterward, subject to retention requirements and approval.

LODESTAR_CONV

Stores data conversion mappings and SQL-based validation rules.

Rules can enforce requirements needed to create records in DNA. Review mappings and validation exceptions as part of each cut.

SAF

Used to set up users and employees for DNA access.

 The SAF person number is different from OSIBANK.PERS.PERSNBR. Do not assume the identifiers are interchangeable.

 

OSINQRY 

Read-only database user. Intended for querying rather than updating data.

OSIEXTN 

Can hold custom applications, including items from the DNA App Store.  Confirm whether any custom applications are in scope for migration or testing.

 

Preparing for go-live

Use the project’s approved readiness criteria and cutover plan to determine whether the final migration can proceed. Recommended checks include:

- Mapping decisions are documented and approved by the appropriate reviewers.

- Required validation and reconciliation activities are complete.

- Outstanding issues have an agreed resolution or an explicitly accepted disposition.

- The final source extract, conversion sequence, and responsibilities are confirmed.

- User access and operational checks are ready.

- Recovery procedures, escalation contacts, and go/no-go responsibilities are documented.

- Post-go-live validation and monitoring are assigned.

After go-live

Continue validating the live results and track issues through the agreed support process. Once the migration is accepted, review temporary conversion data and objects for cleanup.

DMPDATA should not become a permanent store of merger data. Before purging it, confirm that required validation evidence, logs, retention obligations, and recovery needs have been addressed and that cleanup is approved.

Key takeaway

A merger migration is an iterative process: map the data, run a cut, validate the results, and repeat. Clear mapping decisions, traceable issues, and shared business and technical review help the team prepare for day one with a common understanding of the data.